Skip to main content
Home · Buyback · Network Card & HBA Buyback
Asset class · NIC & HBA

Network Card & HBA Buyback

Reuse-First buyback for retired network interface cards and host bus adapters — Mellanox/NVIDIA ConnectX, Intel X-series, Broadcom NetXtreme, QLogic FC HBA, Emulex FC HBA, Marvell iSCSI — in Canada. Settled in CAD against PO.

Models and families covered

Mellanox / NVIDIA ConnectX (CX5, CX6, CX7) — 25G, 100G, 200G, 400G Ethernet and InfiniBand. Intel Ethernet X-series (X550, X710, X810, E810). Broadcom NetXtreme. QLogic / Marvell FC HBA (16G, 32G, 64G). Emulex FC HBA. iSCSI HBA.

NIC and HBA pipeline

High-speed NICs (NVIDIA ConnectX-6/7, Intel E810) retain firm secondary value because the buyer pool is concentrated in cloud, AI, HPC. Older NICs (X-series, NetXtreme) clear at modest residual. FC HBAs hold value in fibre-channel storage refurb.

Settlement and engagement mechanics

Settlement is in your reporting currency (CAD) against your purchase order, line-item per asset, payment terms agreed in the SOW. Programme engagements run on milestone-based settlement against the rolling pickup schedule with monthly true-up. Cross-border engagements (where the asset routes between Maxicom operating regions) are consolidated to your reporting-currency entity through internal Maxicom inter-company arrangements; the customer-facing transaction is single-currency. The SOW is structured per the Maxicom legal entity that contracts with you (Maxicom UAE, Maxicom India, Maxicom Singapore, Maxicom Canada, Maxicom Hong Kong); GST / VAT / HST / withholding-tax treatment is handled per local tax law. Quote validity follows the asset class — 14 days for steady-state enterprise hardware, 5 business days for AI accelerators where the secondary market re-prices weekly, 30 days for memory and components. We re-quote without penalty where the validity has lapsed and the customer is ready to transact.

Audit defensibility and certificate format

Every asset routed through this engagement receives a per-asset Certificate of Destruction with eleven required fields: serial number, make/model/capacity, data classification at retirement, sanitisation method (Clear/Purge/Destroy under NIST SP 800-88 Rev. 1, with the specific technique cited), particle size or field strength or encryption algorithm where applicable, sanitisation tool + version + verification response, UTC timestamp + facility location, operator name + ID + signature, witness signature where present, chain-of-custody reference back to the pickup manifest, and the destruction reason where Reuse-First triage was overridden. Certificates are admissible against OSFI B-13, PIPEDA, NIST SP 800-88 Rev. 1, IEEE 2883-2022, and (where contractually specified) DoD 5220.22-M and NAID-grade Protocol — one certificate covers all simultaneously. Certificate retention is 7 years default, 8+ years for BFSI engagements, longer where the master service agreement specifies.

Cross-border resale routing under NDA

Where local market depth in Canada cannot absorb the retiring volume at fair refurb pricing, working assets route cross-border through Maxicom's trader-channel network — MENA → ASEAN, IND → ASEAN + MENA, CA → US sub-tier markets and ASEAN, SG → MENA + ASEAN. The routing decision is made per asset-class at engagement scoping; the customer sees the routing on the SOW and can opt out where channel-respect or sovereign-data-residency rules require. NDA discipline is standard. Surplus does not return to your own market's primary channel without explicit consent. Export classification (US BIS for AI accelerators; equivalent local regimes for other restricted-class hardware) is handled before the trade closes; restricted-party screening is part of every cross-border transaction.

Reuse-First disposition KPIs reported back to you

Programme-level engagements receive quarterly business reviews covering: total tonnage processed, Reuse-First reuse rate (% refurbished and redeployed vs % destroyed by media class), residual value recovered in CAD, embodied-carbon-recovered estimate (CO₂e avoided by keeping working assets in service rather than replacing them with newly-manufactured hardware), diversion-from-landfill percentage, material-recovery breakdown, and exception reporting. The reporting format is mapped to your sustainability reporting framework — CSRD ESRS E5, ISSB IFRS S1/S2, BRSR Principle 6, GRI 301/305/306, SASB IT services standards. Single-event engagements receive the same data as a per-engagement summary attached to the consolidated certificate. The reuse-rate metric is the most informative KPI: our blended cohort typically runs around two-thirds reuse rate (indicative); programme engagements typically improve year-over-year as the engagement learns the asset mix.

Key models in our pipeline

NVIDIA ConnectX-7 · ConnectX-6 · Intel E810 · X710 · QLogic QLE2772 · QLE2872 · Emulex LPe35002

Buyback settlement — quote to CAD Line-item per asset · 7 business day payment terms · CAD against your purchase order 1 Asset list Photo or sheet per engagement SLA 2 Written quote Line-item per asset Validity 14d (5d for AI) 3 Pickup + wipe Signed manifest NIST 800-88 / IEEE 2883 4 Settlement CAD vs PO 7 business days Cross-jurisdiction settlement Where the engagement spans multiple Maxicom operating regions, settlement consolidates to your reporting-currency entity via internal Maxicom inter-company arrangements. The customer-facing transaction is single-currency. Programme engagements: milestone-based with monthly true-up. Locked-rate option for AI hardware (10-15% discount, 30-90 day window).
Reviewed by the Maxicom compliance desk. Last updated April 2026.
Operates to NIST 800-88 · PIPEDA · OSFI B-13 · NAID-grade · IEEE 2883-2022
References

Authoritative references

Primary sources for the standards and frameworks referenced on this page. Maxicom maps every engagement to these recognised authorities.

Frequently asked questions

Frequently asked questions

Do you take loose NICs/HBAs?

Yes — preferred form for pricing.

What about InfiniBand HCAs?

Yes — NVIDIA Mellanox InfiniBand HCAs (ConnectX-6/7 IB) command firm pricing in HPC and AI cluster refurb.

How is settlement structured for this engagement?

In CAD against your purchase order, line-item per asset, payment terms agreed in the SOW. Programme engagements run on milestone-based settlement.

What standards do your certificates cite?

NIST SP 800-88 Rev. 1, IEEE 2883-2022, DoD 5220.22-M (where contractually specified), NAID-grade Protocol, plus your local privacy law: DPDPA 2023 in India, PIPEDA + OSFI B-13 + Quebec Law 25 in Canada, PDPA Section 24 + MAS TRM in Singapore, UAE PDPL Article 21 + DIFC DPL + ADGM in the UAE. One certificate covers all simultaneously.

Will Maxicom be named in our regulator inspection?

No, unless you specifically permit it. NDA is standard.

What is the typical Reuse-First reuse rate you achieve?

Typically around two-thirds blended (indicative) — roughly two-thirds of retired tonnage refurbished and redeployed, one-third destroyed by classification or asset class. Programme engagements typically improve year-over-year.

When you are ready

Send the asset list. We will send the number.

A photograph of the rack works. A spreadsheet works better. CAD settlement, against PO.

purchase@maxicom.ca · per engagement SLA